Content was mediocre. Structure was poor. Authorship was appalling. Ideal for engineers. Read the Lenahan text instead, it's far better.
M**H
Good Reference
Focuses mostly on the planning and scheduling phase of projects. It breaks down a lot of the pre-outage work as well as the different documents and contracts that could be used. Includes example shutdowns in the appendices