✨ Drive Your Legacy with Distinction! ✨
This 3-inch diameter auto emblem from The Masonic Exchange is crafted from durable aluminum alloy and finished with epoxy paint and a clear coat for weather resistance. Lightweight at 18 grams, it features an adhesive backing for easy, tool-free installation, making it the perfect accessory for any Order of Eastern Star sister to showcase pride and affiliation on their vehicle.
Manufacturer | The Masonic Exchange |
Brand | The Masonic Exchange |
Product Dimensions | 7.62 x 7.62 x 0.33 cm; 18 g |
Item model number | TME-EMB-00142 |
Exterior | Aluminum |
Manufacturer Part Number | TME-EMB-00142 |
Position | Rear |
Item Weight | 18 g |
Trustpilot
Hace 2 meses
Hace 3 días